Archilyzer · Source

archilyzer

Archilyzer
git clone https://archilyzer.pages.dev/source/archilyzer.git
Log | Files | Refs | README | LICENSE

commit 1ba3a0dbe960b8796ea07a330dfd0e850734ef21
parent dfb6ccfe0e36f6359df997c1634b015d46ae95a8
Author: I Mean I'm Just Saying <imeanimjustsaying@kiwifarms.st>
Date:   Wed, 14 Oct 2026 13:54:24 -0400

plans: umtool redesign — R5 follow-up gates (full umtool e2e 454/0/6, board.spec 3× green)

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>

Diffstat:
Mplans/umtool-redesign.md | 16++++++++++++++++
1 file changed, 16 insertions(+), 0 deletions(-)

diff --git a/plans/umtool-redesign.md b/plans/umtool-redesign.md @@ -2517,3 +2517,19 @@ Delete schedule; Edit cadence opens on its cadence select and Escape returns to - Not touched (R4's): `common/lib/report/draft/**`, `controller/reportDraft.ts`, `lib/report/iterations.ts` (imported only), `_researchEditor.ts`, the report-draft route. +| sha | what | +|---|---| +| `7e2301e7` | the whole-day edition window and the empty case; the plan's and the series page's words; Delete as an outline button; the board's field keys wait for a redraw; the stub's clock; `window.test.ts`, the schedule tests, `recurring.spec`, `board.spec` | +| `5e7bd515` | this follow-up's record, `[Unreleased]` bullets | +| (this commit) | the follow-up's gates | + +Gates on `5e7bd515`: repo-wide tsc clean; common **4129 tests, 4128 pass, 1 fail** — `controller/fetchPosts.test.ts`'s +"a drain mid-page waits…" (a timing test, untouched here, load average ~20 while e2e builds ran), then 6/6 green alone in +this worktree and 4/4 on `main` in the primary; editor unit 297/297; umtool unit 858 tests, 856 pass, 2 skipped; +`pnpm --filter umtool test` 24/24; test:scripts 1010, 1007 pass, 3 skipped, 0 fail; docs `cli` and `settings` checks +clean; capped umtool build exit 0 (1.48 GB); capped editor build exit 0 (24.2 s compile); editor `ops-api.spec` 14/14; +**`board.spec` alone 3× — 7/7, 7/7, 7/7**; `recurring.spec` 7/7; **full umtool e2e 460 tests: 454 passed, 0 failed, 6 +skipped** (12.5 min). Screenshots re-taken in `r5-shots/` (20) from the full run: the series page shows a done week +(2026-10-12 … 10-18), the at-once tick's "Nothing to cover yet — the next edition starts 2026-10-19" in the tick log, +and the quiet week after. +